Replacing Components of
a Host Running in Degraded Mode
The procedures for replacing components
of hosts in a degraded state depend on whether the host is assigned or unassigned. An assigned
host belongs to a workload domain. An unassigned host has been commissioned, but is not assigned
to a workload domain.
Before proceeding, review the guidance
provided in the Avoiding Unintentional Downtime.
These procedures apply to the
following components:
- CPU
- Memory
- Out-of-Band Management
- Power supply