by performing the operational verification steps for different networking components in NSX-T Manager.Verify the Authentication in NSX Manager Using a Local System Account
Verify that you can authenticate to NSX Manager by using the built-in
admin
account.Expected Outcome |
---|
You can authenticate to NSX Manager by using the admin account and access the NSX Manager user interface. |
- Log in to the NSX Manager instance for the management domain athttps://<management_domain_nsxt_manager_fqdn>/login.jsp?local=trueasadmin.
- After login, verify that you can access the NSX-T home page.
- Repeat the procedure for the NSX Manager instance for the VI workload domains.
If you encounter issues while performing this procedure, use the following troubleshooting tips:
Troubleshooting Tips |
---|
|
Verify the Cluster Status of NSX Manager
Verify the status of NSX Manager clusters for the management and VI workload domains.
Expected Outcome |
---|
The NSX Manager clusters for the management domain and the VI workload domains have a Stable status. |
- Log in to the NSX Manager instance for the management domain athttps://<management_domain_nsxt_manager_fqdn>/login.jsp?local=trueasadmin.
- On the main navigation bar, click theSystemtab.
- In the left pane, select.
- On theAppliancespage, verify that the cluster has aStablestate.
- Repeat the procedure for the NSX Manager clusters for the VI workload domains.
If you encounter issues while performing this procedure, use the following troubleshooting tips:
Troubleshooting Tips |
---|
|
Verify the Integration of NSX-T Data Center with vSphere
Verify that the vCenter Server instances for the management and VI workload domains are registered with NSX-T Data Center.
Validate the registration status of the management and the VI workload domain vCenter Server instances in NSX-T Data Center.
Expected Outcome |
---|
The status of each vCenter Server instances is Registered in the respective NSX Manager instances. |
- Log in to the NSX Manager instance for the management domain athttps://<management_domain_nsxt_manager_fqdn>/login.jsp?local=trueasadmin.
- On the main navigation bar, click theSystemtab.
- In the left pane, select.
- Verify that the registration status of the management domain vCenter Server isRegistered.
- Repeat the procedure for the NSX Manager instances in the VI workload domains.
If you encounter issues while performing this procedure, use the following troubleshooting tips:
Troubleshooting Tips |
---|
|
Verify the Status of the Edge Transport Nodes
Verify that the edge transport nodes in NSX Manager are working and that their configuration has no errors.
Expected Outcome |
---|
The node status of all edge transport nodes is Up and the configuration state is Success . |
- Log in to the NSX Manager instance for the management domain athttps://<management_domain_nsxt_manager_fqdn>/login.jsp?local=trueasadmin.
- On the main navigation bar, click theSystemtab.
- In the left pane, select.
- Click theEdge transport nodestab.
- Verify that the Configuration state of all edge transport nodes isUpand the configuration state isSuccess.
- Repeat the procedure for the NSX Manager instances in the VI workload domains.
If you encounter issues while performing this procedure, use the following troubleshooting tips:
Troubleshooting Tips |
---|
|
Verify the BGP Connection Status for the Tier-0 Gateways
If you are using BGP for north-south connectivity in
VMware
Cloud Foundation
, verify the connection status of the Tier-0 gateways by generating a BGP summary report in NSX Manager.Expected Outcome |
---|
The BGP connection status of all edge transport nodes is Established . |
- Log in to the NSX Manager instance for the management domain athttps://<management_domain_nsxt_manager_fqdn>/login.jsp?local=trueasadmin.
- On the main navigation bar, click theNetworkingtab.
- In the left pane, select.
- On theTier-0 gatewayspage, click theAvailable actionsdrop-down menu for the Tier-0 gateway and selectGenerate BGP summary.
- On theBGP summarydialog box, verify that the connection status of all edge transport nodes isEstablished.
- Repeat the procedure for the NSX Manager instances in the VI workload domains.
If you encounter issues while performing this procedure, use the following troubleshooting tips:
Troubleshooting Tips |
---|
|
Verify the Operational Status of the NSX Load Balancers
If you have created a load balancer in NSX-T Data Center or if you have deployed the vRealize Suite Lifecycle Manager in
VMware
Cloud Foundation
mode, verify the load balancer status in NSX Manager.Expected Outcome |
---|
The operation status of each NSX load balancer is Up . |
- Log in to the NSX Manager instance for the management domain athttps://<management_domain_nsxt_manager_fqdn>/login.jsp?local=trueasadmin.
- On the main navigation bar, click theNetworkingtab.
- In the left pane, select.
- Click theLoad balancerstab and verify that the status of the load balancer isSuccess.
If you encounter issues while performing this procedure, use the following troubleshooting tips:
Troubleshooting Tips |
---|
|
Verify the Connectivity Status of NSX-T Data Center Segments and Gateways
Verify the status of all Tier-0 and Tier-1 gateways, and of all network segments in NSX Manager for the management domain and VI workload domains.
Expected Outcome |
---|
All Tier-0 and Tier-1 gateways, and all network segments have a Success status. |
- Log in to the NSX Manager instance for the management domain athttps://<management_domain_nsx_manager_cluster_fqdn>/login.jsp?local=trueasadmin.
- On the main navigation bar, click theNetworkingtab.
- Verify the status of the Tier-0 gateways.
- In the left pane, select.
- On theTier-0 gatewayspage, verify that the status of all Tier-0 gateway isSuccess.
- Verify the status of the Tier-1 gateways.
- In the left pane, select.
- On theTier-1 gatewayspage, verify that the status of all Tier-1 gateway isSuccess.
- Verify the status of the segments.
- In the left pane, select.
- On theSegmentspage, verify that the status of all network segments isSuccess.
- Repeat the procedure for the NSX Manager instances for the VI workload domains.
If you encounter issues while performing this procedure, use the following troubleshooting tips:
Troubleshooting Tips |
---|
|
Verify the Integration Status Between the NSX-T Data Center and the ESXi Hosts
Verify the node status and the NSX configuration status for the ESXi hosts in NSX-T Data Center and ensure that no issues exist.
Expected Outcome |
---|
The NSX configuration status of the ESXi hosts is Success and their node status is Up . |
- Log in to the NSX Manager instance for the management domain athttps://<management_domain_nsxt_manager_fqdn>/login.jsp?local=trueasadmin.
- On the main navigation bar, click theSystemtab.
- In the left pane, select.
- On theHost transport nodestab, fromManaged bydrop-down menu, select the vCenter Server instance for the workload domain.
- Expand the default management cluster.
- Verify that the NSX configuration status isSuccessand that the node status isUpfor all ESXi hosts in the cluster.
- Repeat the steps for each cluster in a VI workload domain.
If you encounter issues while performing this procedure, use the following troubleshooting tips:
Troubleshooting Tips |
---|
|